Equipment Range For Every Phase
Mini excavator for precision and tight access. Full skid steer for volume earthmoving. The right machine for every part of the job.
Hoosier Dirt & Gravel handles site preparation and grading work for builders and property owners across central Indiana. From rough grading at the start of a new build to final grade ahead of concrete and landscaping, the work we do sets up the rest of the project to come together clean.
A bad grade shows up the first time it rains, the first time the slab cracks, the first time the foundation shifts. Most building problems trace back to grading that was rushed or done wrong from the start. Our work prevents the issues that catch builders and homeowners off guard years later.
Mini excavator for precision and tight access. Full skid steer for volume earthmoving. The right machine for every part of the job.
We handle the finish grading other excavation outfits skip. Concrete and landscape crews appreciate showing up to a clean pad.
Water flow is calculated from day one. No corrective drainage work needed after the build is done.
Same hands from first estimate to final grade. No subs, no handoffs, no surprises.
Our site prep process is built around what comes next. We work with builders, concrete crews, and landscapers to make sure the grade is ready when they show up.
Walk the property to evaluate existing grade, drainage, and access
Rough grade and prep the building footprint or pad area
Final grade and shape the surface for concrete, landscape, or asphalt
Bad site prep doesn't show up the day the build is done. It shows up months or years later, when it costs ten times as much to fix.
Heavy rain or frozen ground may push grading work for quality reasons. We schedule around the weather so the prep holds.
Site prep timing often ties to concrete, framing, and utility schedules. We work with your builder or GC to line the work up right.
Small pads and simple grading projects run 1-3 days. Full new-build site prep with rough and final grading may run 1-2 weeks.
Quick answers to the questions we hear most often from property owners planning a project.
A simple pad or small grading job usually runs one to three days. Full site prep for a new build with rough and final grade can run one to two weeks depending on the size of the footprint and the conditions.
Yes. We can take a site from rough grade at the start of a build all the way to final grade ahead of concrete, asphalt, or landscaping. A lot of outfits skip the finish work; we don't.
That's a big part of what we do. We level and prep the pad, plan the drainage into the grade, and set it up so the build sits right and water moves away from it.
Yes. Site prep timing usually ties into framing, concrete, and utility schedules. We'll work with your builder or GC to line the grade up so it's ready when the next crew shows up.
A bad grade shows up the first time it rains, the first time a slab cracks, the first time a foundation shifts. Getting the grade and drainage right at the start prevents the expensive problems that surface years later.